The high profile 1960s commercial office block in the centre of the city has been converted into new luxury apartments for rent on behalf of commercial property management specialists Fara Estates. Birmingham based fabricator Kalsi Plastics were awarded the contract because of their growing expertise in this type of commercial work.
Via its Plastic Centre outlet in Leicester, Kalsi Plastics supplied and installed more than 200 casement windows in Rehau Total70C profile. These were specified because they could meet the thermal performance specification set out by the developers and because they offered the 35dB acoustic performance required.
Epic House overlooks Leicester’s new central bus terminus so the ability of the windows to minimise noise levels was particularly important. The ground floor has been developed into a large new Wilko store and, very much in line with the trend towards using commercial office space for housing and the previously extended permitted development rights, the floors above have been converted into apartments.
The architects on the project were the Brian Dearlove Partnership and the client was Fara Estates.
Kalsi Plastics has been a Rehau fabricator since 2007 and produces 1000 frames per week in the 70mm Rehau Total70 system. The company has CHAS accreditation for working on site.
Euroglaze, the Barnsley-based Rehau trade fabricator, continues to invest in its continuous improvement programme, with…
Trade fabricator Sternfenster has reported strong customer growth in 2025, welcoming 105 new trade customers…
Companies in the glazing and construction industry can now start chasing new business leads within…
FACTS AND FIGURES: First job: Administrator at a Sheet Metal Work Fabrication company. I joined…
Andy Royle, Director and Co-Founder of Leads 2 Trade, explains how installers can start the…
Fabframes has brought forward the next phase of its aluminium strategy after experiencing exceptional trade…