A clamp unit ensures the correct positioning of sections even at this extended width and counterblocks can be mounted quickly and accurately. A 12 piece tool magazine on the gantry gives customers maximum flexibility and reduces tool changeover times to optimise the productivity and efficiency of the machine.
Camel Glass’ Managing Director, Steve Oakes, explained: “The 944 gives us the perfect balance of performance and payback. It fitted within our budget, without compromising on quality which was our primary aim. It means we’re able to speed up production to reduce lead times and maintain competitive pricing for our customers.” One of the other big advantages of the 944 for Camel Glass was that it could link with the LogiKal manufacturing software which was being installed at the same time. Steve Oakes added: “Buying a Tekna machine from Emmegi (UK) means we have the backing of one of Europe’s leading manufacturers, with a great team on the ground to take care of installation, training and servicing. It’s already making a really positive difference within our factory.”
Camel Glass has four production facilities across Devon and Cornwall producing a comprehensive range of doors, windows, sun rooms, architectural glazing and glass balustrades for trade, retail and commercial customers. The Tekna 944 machining centre has been installed at its Holsworthy factory where it manufactures frames in Schüco, Senior and Reynaers systems.
www.camelglass.co.uk
www.emmegi.com
Inwido acquires Victorian House Window Group, a highly profitable company known for its well reputed…
The UK glass and glazing sector came together in style on 28 November for the…
A traditional red-brick new-build property nestled in the Sussex countryside has been constructed as a…
The UK’s fenestration industry entered 2025 with tempered expectations, and the year has not disappointed…
ACJ Aluminium in Cannock has signed a three-year supply agreement with Stellar Aluminium Systems, marking…
Window and door steel reinforcement specialist, Anglo, is helping fabricators cut their reinforcement costs by…