The main contractor on the project was Bardsley and the company invited Profile 22 Approved Window Contractor Framexpress to tender for the 120 windows required on the project. Sarah Price, Commercial Sales Manager at Framexpress, said: “We’ve worked with Bardsley on several previous occasions. Our ongoing relationship with them, combined with our strong track record and a competitive quote meant we clinched the contract.”
The project’s architects, Triangle Architects, had specified the Flush Tilt and Turn Windows in Anthracite Grey for the project because of its ability to deliver aluminium aesthetics but with a better performance.
The Epwin Window Systems’ specification team worked closely with Framexpress throughout, providing vital technical information that gave Bardsley necessary documentation and making site visits during the construction phase to maintain close contact at all times. This ensured a close-knit team dedicated to a high quality end result.
The Strand is an impressive project that will help to regenerate the Kirkholt district of Rochdale. Clare Tostevin, RBH Director of Communities, said: “This is a landmark development which will revitalise the heart of Kirkholt, providing a range of new facilities for the community together with high-quality new shops and homes.”
Heritage Trade Frames has announced plans to relocate its entire operation to a new purpose-built…
Cortizo introduces a new 45 mm sash for the bi-fold system: a solution that reduces…
MACO was awarded Gold in the German Innovation Award 2026 in Berlin in the “Excellence…
ASSA ABLOY is delighted to announce the expansion of its enhanced UK test centre –…
Hardware distributor Safeware is being introduced across Quay Plastics, Shepherds, National Plastics and PBS trade…
As the glazing sector adapts to shifting consumer behaviour and increasing access to information, the…